Notre Dame Primary School, Glasgow
A £15m renovation and extension of the old C-listed Victorian building that housed Notre Dame Primary School combining St Peters and Notre Dame Primary Schools in one building.
Anderson Floor Warming And Renewables designed, supplied and installed underfloor heating, insulation and screed to the brand new three storey extension.
The picture above shows the underfloor heating pipes laid on top of the insulation ready to be tested before a screed finish is applied on top. Below shows a manifold ready to be connected to the hot water supply with the underfloor heating pipes within a screed finish.
Our pipe in staple system is perfect for the angular rooms on the ground floor of the extension allowing for maximum floor coverage for the underfloor heating as can be seen in our design drawing below.
A £15m renovation and extension of the old C-listed Victorian building that housed Notre Dame Primary School combining St Peters and Notre Dame Primary Schools in one building.
Anderson Floor Warming And Renewables designed, supplied and installed underfloor heating, insulation and screed to the brand new three storey extension.
The picture above shows the underfloor heating pipes laid on top of the insulation ready to be tested before a screed finish is applied on top. Below shows a manifold ready to be connected to the hot water supply with the underfloor heating pipes within a screed finish.
Our pipe in staple system is perfect for the angular rooms on the ground floor of the extension allowing for maximum floor coverage for the underfloor heating as can be seen in our design drawing below.