Mar 242018
 

UK’s First BREEAM (2014) “Outstanding” Building, South Lanarkshire College, East Kilbride

Heating System – Ground Source Heat Pump installed by Anderson Floor Warming and Renewables (NIBE F1345 A+++ rated): six 200m deep boreholes extract 8°C from the ground. Low-energy, low-temperature heating system runs at 35°C. Output 40kW of heat if required.

Want to know how we can help install low-energy renewable technologies and reduce your carbon floot print? Contact our sales team 0141-647-6716 or click here to request an estimate

Project Management – Gardner and Theobald; Sustainability Advisor – BRE Scotland; Construction – CCG ; Architect – Austin Smith Lord; Cost Consultant – Doing and Smith; Engineers – Cundall; Structural Engineers – Will Rudd Davidson

Products Used

 Posted by at 12:04 am

 Leave a Reply

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

(required)

(required)